incl. twisting protection and cable entry, 3 pcs. thread on a ø 195mm hole circle; incl. 3 pcs. screws M16 x 55
cable entry
500mm below the top of the earth
colour
no powder coating
installation
in-ground, installation depth 800mm
specials
Installation advice: When inserting the engaging piece into the ground, please ensure that the holes on the flange plate are aligned so that all bollards light up in the desired direction and the doors are in the desired location. The door and / or the light outlet is always between 2 holes. In the case of a second light exit, this is always 180 ° opposite the first light exit in the middle above a hole in the flange plate.